We recently completed a pathway installation project for a local council, designed to enhance accessibility and safety around play areas within a public park. The project included the complete installation of pathways, which complement the play surfacing we previously installed. Our work involved full base preparations, drainage integration, and a durable Tarmac top layer to ensure longevity and resilience against heavy foot traffic.
Working in a public park setting required rigorous adherence to safety and compliance standards. We provided comprehensive risk assessments and ensured our team held all necessary liability insurances to meet the council’s requirements. These precautions were essential for ensuring the safety of park visitors and minimising disruptions during construction.
Throughout the project, Soft Top Surfacing maintained close communication with the council to ensure all work was completed within the agreed-upon timelines and budget. The project was signed off by the client upon completion, meeting all expectations for quality and compliance. This tarmacadam installation has provided the local community with improved access to play areas, enhancing both the functionality and safety of the public space.
Contact our team today for a free site survey!